Fish & Aquatics, Water Quality, and Hydrology Work Group
An agency and stakeholder work group has been formed to discuss study plans and field work for the 2009 reconnaissance study effort. The work group will continue to meet as necessary through the FERC licensing process.
Meeting Summaries
- March 24, 2009 Fish and Aquatics Workgroup Meeting (pdf)
- July 16, 2009 TWG Meeting Summary and Midseason Field Update (pdf)
Study Plans
2010 Study Plans
The 2010 draft study plans below are currently available for review and comment by agencies and stakeholders. Comments on the draft study plans are requested by July 6, 2010 and may be emailed to comments@kenaihydro.com.
(Note: to see draft study plans for other resource areas, please select from the list of Work Groups on the left navigation pane)
2009 Study Plans
- Aquatic Biology Study Plan (pdf)
- Water Quality Study Plan (pdf)
- Hydrology Station Location Technical Memo (May 2009) (pdf)
- September 2009 Field Schedule (09-03-09)
Study Reports
Instream Flow Technical Work Group
The Instream Flow Technical Work Group (TWG) has been formed to review proposed methodology for an instream flow study to be conducted during the FERC licensing process.
Meeting Summaries
- April 21, 2009 Instream Flow Technical Workgroup Meeting Summary (pdf)
- May 19, 2009 TWG Meeting Summary (pdf)
- September 22-23, 2009 Instream Flow Site Visit and TWG Meeting Summary (pdf)